2.Technical data
Item | Machine | Photo of machine | Technical specifications | |
1 | Screw loader | | Motor power: 2.2KW Part contact with raw materials: stainless steel Adopt ABB frequency inverter control | |
2 | SJ90/30 extruder | | Single screw feeder
| |
barrel screw : 38CrMoAlA Speed: 10~120rpm Motor power: 55KW vacuum pump:1.5kw Screw Diameter: φ90; L/D: 30/1 Cooling mode: force-air cooling material: reducer casing is 20CrMnTiA and carburizing treatment; distributor box is 38CrMoAlA and nitrogen treatment speed controller: ABB inverter | ||||
3 | Hydraulic screen changer |
| Triple-phase asynchronous inverter motor | |
Model: HSG110/55×230 Motor power: 1.1KW Tank size: φ110mm×230mm working pressure: 16-20Mpa Frequency conversion motor adopts ABB inverter Die fast hydraulic device to replace the network | ||||
3 Production line
1. Forced feeding machine 2.SJ90/30 extruder 3. Hydraulic screen changer
4. Water ring dicing 5. Conveying channel/water tank 6. Centrifugal dewatering machine
Electric cabinet :
-“RKC” temperature control system
ABB inverter
Low voltage electric :Schneider
4. After-sales service
4.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
4.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer’s factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer’s factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD50 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer’s factory.
e. If buyer doesn’t request installation and commissioning by Seller’s engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
4.3. Quantity and quality guarantee
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
4.4. Validity: Three months since quotation date.
We thank you for your inquiry and would be pleased to receive your order soon.